Park Garage Group PLC — Rushden
Design, grid connection, and installation of 2x 480kW DC ultra-rapid EV chargers at a new-build site in Rushden for Park Garage Group PLC.


Location
Land at John Clark Way, Rushden, NN10 0FW
Sector
Fuel Retail / Forecourt
Duration
12 weeks
Services
Grid Connection, EV Charging, Civil Works, Project Management
THE CHALLENGE
Park Garage Group PLC required 2x 480kW DC ultra-rapid EV chargers at a new-build site in Rushden, Northamptonshire. The greenfield location needed a full grid connection, civil groundworks, and charger installation — all delivered to a tight programme to align with the wider site development.
OUR APPROACH
Spiral Renewables delivered the full project from feasibility through to commissioning — including DNO grid connection application, civil engineering, electrical installation, and charger deployment.
We managed all contractor coordination on site, ensuring the EV charging infrastructure was delivered in step with the broader development programme and to the highest safety and quality standards.
THE OUTCOME
The Rushden site was delivered on time and on budget, providing 2x 480kW DC ultra-rapid EV charging capability at a strategically important location in Northamptonshire. The hub is now operational and serving both commercial and consumer EV drivers.
KEY DELIVERABLES
Full DNO grid connection application and approval
Civil groundworks including trenching, ducting, and surface reinstatement
2x 480kW DC ultra-rapid charger installation and commissioning
Canopy and lighting infrastructure
Payment and back-office system integration
Ongoing maintenance and support agreement