eHGV CHARGING
eHGV Charging Infrastructure
Complete eHGV charging feasibility and end-to-end installation across the UK. We deliver the infrastructure that keeps electric heavy goods vehicles moving.
Purpose-Built for Heavy Goods
Electric HGV charging demands a fundamentally different approach to passenger EV infrastructure. Higher power requirements, larger vehicle footprints, and extended dwell-time profiles all require specialist design and engineering.
Spiral Renewables delivers eHGV charging solutions from initial feasibility through to full commissioning — purpose-built for depot, distribution centre, and en-route locations across the UK.

Feasibility & Grid Strategy
Every eHGV project starts with a rigorous feasibility assessment. We evaluate grid capacity, site access, vehicle duty cycles, and power demand profiles to determine the optimal charging strategy.
Our grid expertise ensures we secure the high-capacity connections that eHGV infrastructure demands — managing DNO applications, reinforcement requirements, and connection design from day one.
- Power demand & duty cycle analysis
- Grid capacity assessment
- DNO/IDNO applications & reinforcement
- Site layout & access planning
- Commercial viability modelling
- High-power charger deployment (150kW–1MW+)
- Commissioning & handover
Key Deliverables
- Power demand & duty cycle analysis
- Grid capacity assessment
- DNO/IDNO applications & reinforcement
- Site layout & access planning
- Commercial viability modelling
- High-power charger deployment (150kW–1MW+)
- Commissioning & handover
End-to-End Installation
From civils and groundworks through to charger procurement, installation, and commissioning, we manage the entire delivery programme. Our integrated approach means one partner, one programme, one point of accountability.
We work with leading high-power charger OEMs and have the engineering capability to deliver megawatt-class charging infrastructure for fleet operators, logistics companies, and public charging networks.